In valve projects, delays rarely come from machining. Machining is the part we control. Delays come from everything that happens between the machines — material that can't be found, parts waiting for the next step, and paperwork that doesn't match the valve.
That's why we built an answer at our Alpha Production Facility in Wenzhou: a fully automated storage and logistics system, running as the physical backbone of our PMC Center.
What it changes on your project:
▸ AGVs and roller lines move every workpiece — no forklifts, no searching, no idle material
▸ Every pallet carries a unique ID: every body, ball and stem stays where the system says it is
▸ Storage, retrieval and dispatch run on one data backbone — from PO to packing list
▸ Full traceability for every valve, which matters most when the certification package has to match the hardware
Three production facilities. 70,000 m² of manufacturing area. Exporting to 40 countries worldwide — capacity is not our constraint. Predictability is what we compete on.
Certainty isn't promised at the loading dock. It's built long before that.